Sign In | Join Free | My chinapackagenet.com
China BOTO GROUP LTD logo
BOTO GROUP LTD
BOTO MACHINE TODAY'S QUALITY IS THE MARKET FOR TOMORROW
Verified Supplier

5 Years

Home > Temperature Humidity Test Chamber >

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time

BOTO GROUP LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time

  • 1
  • 2
  • 3

Brand Name : BOTO

Model Number : B-T-80

Certification : ISO GB

Place of Origin : CHINA

MOQ : 1

Price : Negotiated

Payment Terms : T/T

Supply Ability : 10000sets per month

Delivery Time : 15working days

Packaging Details : PLY-WOODEN-CASE

Relative humidity(Temp&Humi) : RH20%-98% (Customize)

Temp Range : -70°C ~ 150°C (Customize)

Heat-up time(min) : 1°C~15°C/min(Linear or non-linear)

Pull-down time(min) : 1°C~15°C/min(Linear or non-linear)

Temp Fluctudtiont : ±0.5°C

Temp Uniformity : ±1°C

Temp&Humi Deviation : ±1°C /±3%RH

Interior : SUS#304 Stainless steel plate

Contact Now

Rapid Temperature Change Test Chamber for Material Performance Testing 1°C~15°C/min Heat-up Time

Product Description

The rapid temperature change test box is used to test the performance of materials in various rapid temperature change environments and test the resistance, cold resistance, dry resistance, and humidity resistance of various materials. Mainly used in the national defense industry, aviation industry, automobile parts, electronic parts, plastics industry, food industry, pharmaceutical industry and related product research and development, quality management engineering test specifications.

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time
Features

1. Imported compressors and refrigeration accessories from internationally renowned brands ensure the stability of the refrigeration system.
2. Special air circulation design, good temperature and humidity distribution uniformity.
3. A full range of imported microcomputer controllers, color touch screens, Chinese and English systems, program setting function can be done, test data can be exported to USB.
4.The cause of the failure can be displayed, making it easy to troubleshoot.
5.Ultra-quiet design, effectively reducing equipment operating noise.
6.Multiple safety protection: refrigerant high pressure protection, compressor overload protection, current overload protection, over temperature protection, leakage protection. It can ensure sample safety and more effectively protect equipment components from overloading operation, greatly reduce the incidence of equipment failures, and make equipment operation more stable and reliable.

Specification

Model Temp B-T-80
(A~E)
B-T-120
(A~E)
B-T-225
(A~E)
B-T-504
(A~E)
B-T-1000
(A~E)
Temp&Humi B-TH-80
(A~E)
B-TH-120
(A~E)
B-TH-225
(A~E)
B-TH-504
(A~E)
B-TH-1000
(A~E)
Internal Dim(CM)
(W*H*D)
40×50×40 45×60×45 60×85×80 70×90×80 100×100×100
External Dim(CM)
(W*H*D)
75×203×203 80×208×208 95×243×243 105×243×243 135×263×263
Relative humidity(Temp&Humi) RH20%-98% (10%~98% Customize)
Temp Range -70°C ~ 150°C (100°C Customize)
A:0°C B: -20°C C: -40°C D: -60°C E: -70°C
Heat-up time(min) 1°C~15°C/min(Linear or non-linear)
Pull-down time(min) 1°C~15°C/min(Linear or non-linear)
Temp Fluctudtiont ±0.5°C
Temp Uniformity ±1°C
Temp&Humi Deviation ±1°C /±3%RH
Interior SUS#304 Stainless steel plate
Exterior Coating or SUS#304 Stainless steel plate
Power Source AC:220V/380V 50/60Hz
Power(KW) Subject to technical plan
Wind Cycling Way Centrifugal fan-broadband type forced air circulation
Refrigeration Way Single stage compression refrigeration
Refrigerator French Tecumseh
Refrigerants R4O4A USA DuPont environmental protection refrigerant(R23+R404)
Condensing Way Air-cooled or water-cooled
Heater Nickel chrome heating wire heater
Humidifier Semi-closed steam and wet
Water Supplying Way Automatic cycling water supply


Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time

Production Details

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time

Factory Inspection
We control quality from the materials, electronic parts, controller,comppressor, solenoid valve, and many parts of the products.

Workshop Machine

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time

Company Profile

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time

BOTO GROUP Ltd. is a private enterprise integrating R&D, production, OEM and sales of scientific and technological equipment manufacturing. Proficient in the production, development and upgrading of various non-standard instruments and automatic instruments. The factory covers an area of 26,666 square meters, headquartered in Shanghai, has several offices in China, the factory annual output of about 2000 sets of equipment. Since the establishment of the company, the company is committed to providing customers with quality products and services, and has been praised by customers.

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time

Main equipment

  • Constant Temperature and Humidity Test Chamber
  • Salt Spray Test Chamber / Corrosion Cyclic Salt Spray Test Chamber
  • UV Accelerated Aging Test Chamber
  • Mini Environmental chamber / Desktop Environmental Test Chamber
  • Walk in Constant Temperature and Humidity Lab
  • High Temperature Chamber and Other Lab Test Equipment etc.
  • The factory has the ability to calibrate, and the customer can also designate a third party organization to calibrate and issue a calibration report.

Certification

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time

Cooperative partners

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time

Our Service

1.High quality guarantee.
2.Shipment with professional documents.
3.Packing as your request, with photo before shipment.
4.Reply within 48 hours and provide solution within 3 working days
5.Professional after-service from our technical team
6.Warranty period 12 months


Package&Delivery
1.Standard exported package: Internal anticollision protection, external export wooden box packaging.
2.Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3. Responsible for the damage during the shipping process, will change the damage part for you for free.
4.30days after confirming order,detail delivery date should be decided according to production season and order quantity.

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time




Product Tags:

Material Performance Temperature Change Test Chamber

      

1°C~15°C/min Temperature Change Test Chamber

      

Rapid Temperature Change Test Chamber

      
China Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time wholesale

Rapid Temperature Change Test Chamber For Material Performance Testing, 1°C~15°C/min Heat-up Time Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: BOTO GROUP LTD
*Subject:
*Message:
Characters Remaining: (0/3000)